Job checklist
Floor install checklist
- Confirm the rooms, material and layout direction
- Check the material acclimated for the agreed days
- Protect walls, doorways and nearby floors
- Remove old flooring and baseboard as agreed
- Repair and level the subfloor before laying
- Leave expansion gaps at the walls
- Install transitions and reset baseboard
- Vacuum and walk the finished floor with the customer
- Before photo of the roomrequired
- Photo of the bare subfloor
- After photo of the new floorrequired
- Area installed (sq ft)
- Days the material acclimated (days)
- Subfloor moisture before laying (%)
- Left spare boxes with the customer
